SHOT 16 Run of storm pipe strung out along the cut, bells forward

Section 03 · Storm

Storm Drainage

A civil engineer spent weeks deciding where every drop of runoff goes. Our job is making the ground agree.

The Scope

RCP, HDPE, and CMP in whatever the drainage plan calls out. Catch basins, junction boxes, drop inlets, headwalls at the outfalls.

Culvert crossings, detention outlet structures, and the underdrains nobody thinks about until a parking lot starts pumping water up through the joints.

What Acceptance Takes

  • Invert elevations shot against the drainage plan
  • Joints wrapped and structures grouted tight
  • Backfill compacted in lifts, not dumped
  • Grates and rims dialed to finished pavement
SHOT 17 Box structure coming off the truck
SHOT 18 Grate and rim dialed in at finished pavement

Storm system in the buyout?

Get the drainage sheets in front of us and the number comes back with the structures counted.

Invite Us to Bid